Office metal wall panel partition wall is a commonly used office metal siding material, which can be used for renovation, building decoration and decoration, and can also be used to decorate corporate headquarters, government offices, hospitals, banks, schools, shopping malls, hotels, Interior walls of apartments, laboratories, etc. How to install a metal partition wall? Below, let’s learn about the installation method of the lower partition wall with Shenzhan Metal.
1. Tool material
Metal wall panels, gloves, wire hangers, screwdrivers, light steel joists, drill bits.
2. Methods/steps
Before installing office metal wall panels, it is necessary to confirm whether the ceiling keel is completed, whether the lines and other buried lines are in place, whether the required materials are in the field, and whether the tools are complete.
3. Construction situation:
1. Process analysis.
Basic elastic wire and processing installation skeleton connector fixing frame, basic installation (after factory processing) on-site hanging plate installation and processing.
2. Install the main frame:
Strict construction is carried out according to the design drawings and modeling requirements, and the surrounding steel U grooves are fixed with bolts. The inside of the U-slot of the dragon skeleton is allocated according to the separation width in the figure.
3. Install the wall panel:
First check the flatness and verticality of the steel frame, and then fasten the bottom plate to the steel frame according to the design structure.
4. Install metal siding partitions on site.
The metal wall panels are removed from the factory for processing and on-site installation. After the above processes are completed, the good metal wall panels in the factory can be installed in place. Generally, fixing methods such as pasting, welding, rivets, and edge fixing are used.
5. Finishing treatment.
After the installation of the office metal wall panel is completed, the surrounding contact surfaces should be treated at hand to ensure that there are no burrs and no peeling. The interface must be solid. When splicing patterns, there should be no obvious defects on the surface of stainless steel, the joints should be tight, and the lines should be consistent.