At present, there are pain points in the construction of other wall decoration materials in the market, labor shortage, high labor cost, on-site processing of materials, serious waste of materials, great influence of technical personnel ability factors, difficult project quality control, many accidents, serious environmental pollution, resulting in a large number of construction projects. Garbage is difficult to manage.
If the wall is made of prefabricated metal-coated wall panels, it is mainly the pre-control of technicians, on-site dimension measurement, construction drawing drawing, factory custom processing and production, and on-site modular installation. During factory production, construction personnel install keels on site according to the drawings. After the keel installation is completed, the metal-coated wallboard is transported to the site. With special accessories, it is convenient, quick and fast to install without any noise or garbage. After the installation is completed, it can be put into use. The cleaning is simple, and the metal-coated wall only needs to be removed board protective film.